USPTO guide
Notice of allowance and the issue fee
By Mahish Guru, Co-founder and CEO, PatentAssist.ai
Updated
A notice of allowance means the examiner has agreed your claims are patentable. You are not finished yet: the issue fee has a 3-month deadline that cannot be extended, and the weeks between allowance and grant are the last chance to file a continuation, cite new prior art or fix the claims. This guide covers the forms, the 2026 fees, what you can still change and what to check before you pay.
Quick answer
- Deadline: pay the issue fee within 3 months of the notice. No extensions (37 CFR 1.311(a)).
- Fee (utility): $1,290 large, $516 small, $258 micro (37 CFR 1.18(a)). Publication fee: $0.
- Before you pay: file any continuation or divisional, any late IDS and any RCE. After payment these get harder (MPEP 1306.03).
- Check entity status: small or micro entity status must be checked again when the issue fee is due (37 CFR 1.27(g)).
- After grant: check the patent term adjustment within 2 months, then docket the maintenance fees.
What the notice of allowance contains
Under 37 CFR 1.311(a) , when the application appears entitled to a patent the USPTO sends a notice of allowance stating the issue fee and any publication fee due. In practice you receive:
- Notice of Allowance and Fee(s) Due (PTOL-85) , with the amount due and the date it was mailed. Part B, the Fee(s) Transmittal (PTOL-85B), goes back with the payment ( MPEP 1306 ).
- Notice of Allowability (PTOL-37) , listing the allowed claims, any examiner's amendment, and any references cited ( MPEP 1302 ).
- Reasons for allowance , if the examiner gives them. You may file comments on them ( 37 CFR 1.104(e)). Read them carefully: they become part of the file history that a court may later use to read the claims.
Allowance often follows an office action response or an examiner interview. If the notice includes an examiner's amendment you did not agree to, raise it before paying.
The issue fee in 2026
Amounts from 37 CFR 1.18 and the USPTO fee schedule in force since January 19, 2025.
| Patent | Large | Small | Micro | 37 CFR |
|---|---|---|---|---|
| Utility or reissue patent | $1,290 | $516 | $258 | 1.18(a) |
| Design patent | $1,300 | $520 | $260 | 1.18(b)(1) |
| Plant patent | $905 | $362 | $181 | 1.18(c) |
The publication fee is $0 for notices from January 1, 2014 (37 CFR 1.18(d)(1)). Before paying at the small or micro rate, confirm the applicant still qualifies: 37 CFR 1.27(g) requires a new determination of entitlement when the issue fee is due, and a loss of status must be notified before or with the payment. See small entity vs micro entity .
The 3-month deadline
The issue fee is due 3 months from the mailing date of the notice, and that period is not extendable (37 CFR 1.311(a), MPEP 1306). The usual month-by-month extensions under 37 CFR 1.136(a) do not apply (see our USPTO extension of time guide for which deadlines can be extended). If the fee is not paid, the application is abandoned.
It can be revived by a petition under 37 CFR 1.137 stating that the delay was unintentional, with the issue fee and the petition fee: $2,260 ( $904 small, $452 micro) within one year of abandonment, $3,000 ( $1,200 / $600) after that (37 CFR 1.17(m)).
What you can still do before and after paying
"Patents issue shortly after the payment of the issue fee," so the USPTO advises filing continuing applications, late IDSs and petitions as early as possible, preferably before paying ( MPEP 1306.03).
| You want to | Before paying | After paying |
|---|---|---|
| Amend the claims or specification | Possible under 37 CFR 1.312, but not as of right: the examiner decides. File before or with the issue fee. | Only through a petition to withdraw from issue for unpatentability, or an RCE. |
| Cite new prior art (IDS) | Under 37 CFR 1.97(d), with a 1.97(e) statement and the $280 fee ($112 small, $56 micro). Without the statement, file an RCE. | Through the QPIDS program, or an RCE with a petition to withdraw from issue under 37 CFR 1.313(c)(2). |
| File an RCE | Yes, and no petition to withdraw is needed (37 CFR 1.313(a)). | Only with a petition to withdraw from issue, granted before the issue date (37 CFR 1.313(c), (d)). |
| File a continuation or divisional | Yes. The USPTO's advice is to file it before paying the issue fee (MPEP 1306.03). | Yes, but only until the patent issues, usually a few weeks later (35 U.S.C. 120). |
Prior art that turns up late
The duty of disclosure under 37 CFR 1.56 applies to every claim still pending, so it continues after allowance. An IDS filed after allowance but before the issue fee is considered only with a statement under 37 CFR 1.97(e): either every item was first cited by a foreign office in a counterpart application no more than 3 months earlier, or no item was cited by a foreign office and, after reasonable inquiry, no one with a duty of disclosure knew of any item more than 3 months earlier. If you cannot make the statement, file an RCE with the IDS. After the issue fee is paid, the USPTO's Quick Path IDS (QPIDS) program, now permanent, lets the examiner consider the IDS without reopening prosecution when nothing in it affects patentability. Our guide to the information disclosure statement has the full rules.
Withdrawal from issue
Before the issue fee is paid, you can ask the USPTO to withdraw an application from issue by petition with good and sufficient reasons and the 37 CFR 1.17(h) fee of $150 ( $60 small, $30 micro). After payment the reasons narrow to three: a claim is unpatentable (with an amendment and explanation), consideration of an RCE, or express abandonment, which may be in favour of a continuing application ( 37 CFR 1.313(c)). The petition must be granted before the issue date, and one granted within about 3 weeks of that date may not stop the patent being published ( MPEP 1308).
Continuations
A continuation or divisional claims the parent's filing date only if it is filed before the parent is patented or abandoned ( 35 U.S.C. 120 ). Allowance is the natural moment to decide: you know which claims the examiner accepts, and a continuation can pursue broader or different claims while the allowed ones issue.
After you pay: issue notification, grant and term
- Issue Notification: gives the patent number and issue date. It is usually in Patent Center on the Wednesday or Thursday before the patent issues ( MPEP 1309 ).
- Grant: US patents issue on Tuesdays (MPEP 1306.03). Later papers should quote the patent number.
- Patent term adjustment: the patent states any adjustment for USPTO delay. To contest it, file a request within 2 months of grant with the $226 fee in 37 CFR 1.18(e) ( 37 CFR 1.705).
- Maintenance fees: a utility patent then needs three maintenance fees, at 3.5, 7.5 and 11.5 years after grant. See USPTO maintenance fees . Design patents pay none and last 15 years from grant ( 35 U.S.C. 173 ).
Planning continuations from the allowed claims
PatentAssist.ai searches USPTO, EPO and Indian records, so you can check late-found art against the allowed claims before you pay, and it drafts claim sets and specifications for new filings. It does not file papers with the USPTO or answer office actions; that stays with you or your practitioner.
More USPTO guides
- How to file a provisional patent application (US)
What a US provisional must contain, the USPTO fees, the 12-month deadline under 35 U.S.C. 119(e), and when to skip it.
- USPTO patent fees (2026)
Every USPTO patent fee for large, small and micro entities, from filing to maintenance, with a fee calculator.
- Patent drawing requirements: USPTO, EPO and India
37 CFR 1.84, the EPO rules that replaced Rule 46 EPC, and Indian rule 15, compared side by side.
- How to write patent claims: USPTO, EPO and India
Claim structure and worked examples, then the claim rules and fees at the USPTO, the EPO and the Indian Patent Office, side by side.
- How to respond to a USPTO office action
Reply deadlines and extension fees, 101, 102, 103 and 112 rejections, interviews, and options after a final rejection.
- Types of patent searches, and which one you need
Patentability, freedom-to-operate, invalidity and landscape searches compared by purpose, timing, scope and deliverable.
- Patentability search: how to check novelty before you file
What counts as prior art under 35 U.S.C. 102 and Art. 54 EPC, the grace period gap, search steps and how to read results.
- Freedom-to-operate search in the US and Europe
In-force claims only, legal status checks at the USPTO, EPO and UPC, FTO opinions after Halo, and design-arounds.
- Invalidity search: prior art to challenge a patent
IPR, PGR, EPO opposition and UPC revocation deadlines, prior art dates, standards documents and claim charts.
- Patent landscape analysis, step by step
Building a CPC and keyword dataset, cleaning families and names, the metrics that matter and the 18-month publication lag.
- How to use USPTO Patent Public Search
Basic and Advanced Search, the three databases, field codes, ADJ, NEAR, WITH and SAME, truncation and a worked search.
- Google Patents search guide
Search operators and fields, Boolean and proximity syntax, non-patent literature, and where Google Patents falls short of the official databases.
- The Cooperative Patent Classification (CPC), explained
How CPC symbols are built, CPC against IPC, the Y section, how to find the right class and how to search it in each database.
- Patent search Boolean operators and search strings
Boolean, proximity and truncation syntax compared across Patent Public Search, Espacenet, Google Patents and The Lens, with semantic search for contrast.
- How to respond to a 35 U.S.C. 101 rejection
The Alice/Mayo steps in MPEP 2106, Ex parte Desjardins and the 2024-2026 USPTO guidance, Berkheimer evidence and Rule 132 eligibility declarations.
- How to respond to a 35 U.S.C. 102 rejection
Anticipation under MPEP 2131, AIA 102(a)(1) and (a)(2), the 102(b) exceptions, inherency and Rule 130 declarations.
- How to respond to a 35 U.S.C. 103 rejection
Graham and the KSR rationales in MPEP 2143, teaching away, motivation to combine, secondary considerations with nexus, and Rule 132 evidence.
- How to respond to a 35 U.S.C. 112 rejection
Written description and enablement after Amgen, 112(b) indefiniteness, 112(f) means-plus-function after Williamson, and 112(d) dependent claims.
- The PCT application: timeline, fees and national phase
The international phase month by month, receiving Office and ISA fees in CHF, USD and EUR, national phase deadlines by office, and a deadline calculator.
- Entering the US national stage under 35 U.S.C. 371
The 30-month deadline and revival, the 371 requirements, national stage fees by entity size, and 371 versus a bypass continuation.
- The US foreign filing license (35 U.S.C. 184)
When a US-made invention needs a license to be filed abroad, the six-month rule, expedited and retroactive licenses, and the Indian and European equivalents.
- Filing a US patent from Europe or India
The 2026 US practitioner rule for foreign applicants, Paris priority and certified copies, small entity status, PCT or direct, fees and translations.
- What is a utility patent?
What a US utility patent covers under 35 U.S.C. 101, the parts of the application in 37 CFR 1.77 order, the 20-year term and USPTO costs.
- Design patents in the United States
What a design patent protects, drawings and the single claim, the 15-year term, Hague filings, LKQ v. GM, and design vs utility patents.
- How to file a nonprovisional patent application
Required parts and fees, claiming a provisional within 12 months, DOCX filing in Patent Center, and what happens after you file.
- Provisional vs nonprovisional patent application
The two US filings side by side, the cost of each route, the effect on term and publication, and a guide to which to file.
- Continuation, CIP and divisional applications
Copendency, patent term, double patenting and terminal disclaimers, the 2025 continuing application fee, and continuation strategy.
- How much does a patent cost?
USPTO fees by entity size from filing to the last maintenance fee, what drives professional fees, EPO fees, and an estimator.
- How to patent an idea in the US
Nine steps from patentability and search to provisional filing, Patent Center, examination and maintenance, with the USPTO's free help programs.
- Small entity vs micro entity status
Who qualifies under 37 CFR 1.27 and 1.29, the 2026 income limit, SB/15A and SB/15B, license traps, fixing errors, and an eligibility checker.
- How long does a patent last?
US utility and design terms, patent term adjustment and extension, terminal disclaimers, maintenance fee deadlines, Europe and India, with an expiry estimator.
- Can AI write a patent application?
What AI drafting does well and badly, the USPTO and EPO positions on AI tools, AI inventorship after 2025, and confidentiality.
- Restriction requirements and election of species
How to answer a USPTO restriction or election of species requirement, from traverse and rejoinder to divisionals and unity in 371 cases.
- Options after a final rejection
Amendment after final, advisory actions, the end of AFCP 2.0, RCE, pre-appeal and appeal, with fees, timing and USPTO outcome data.
- Request for continued examination (RCE)
What 37 CFR 1.114 requires, first and later RCE fees, patent term effects, and when an RCE beats an appeal.
- Information disclosure statements (IDS)
The duty of disclosure, IDS timing windows and fees, the 2025 size fee, EPO search reports, Therasense and QPIDS.
- PTAB ex parte appeals
Notice of appeal to decision step by step, with fees, deadlines and the PTAB's FY 2026 pendency and outcome statistics.
- Track One prioritized examination
Track One requirements, fees by entity size, the 20,000 annual cap and USPTO timing data, plus PPH and age or health petitions.
- 35 U.S.C., annotated: US patent law section by section
The current text of 34 key sections of Title 35 with plain-English summaries, key cases, 37 CFR rules and MPEP references.
- USPTO maintenance fees (2026)
Maintenance fees at 3.5, 7.5 and 11.5 years for large, small and micro entities, the grace period, reinstatement and a due-date calculator.
- PCT national phase deadlines by country
30, 31 or more months: the national phase time limit at every office in WIPO's table, late-entry options and a deadline calculator.
- PCT search report, written opinion and Chapter II
How to read the international search report and written opinion, Article 19 amendments, informal comments, and when a Chapter II demand is worth filing.
- USPTO extensions of time (37 CFR 1.136)
One to five-month extension fees by entity size, which deadlines can and cannot be extended, how to request one, and what happens after abandonment.
Notice of allowance and issue fee: frequently asked questions
What is a notice of allowance?
It is the USPTO's notice that your application will issue as a patent once you pay the issue fee. It comes on form PTOL-85, "Notice of Allowance and Fee(s) Due", usually with a Notice of Allowability (PTOL-37) that lists the allowed claims and any examiner's amendment (37 CFR 1.311, MPEP 1302 and 1303).
How long do I have to pay the issue fee?
3 months from the date the notice of allowance was mailed. The period cannot be extended (37 CFR 1.311(a)). If you miss it, the application is abandoned and can only be revived by a petition under 37 CFR 1.137 showing the delay was unintentional.
How much is the USPTO issue fee in 2026?
For a utility patent, $1,290 for a large entity, $516 for a small entity and $258 for a micro entity. A design patent costs $1,300 / $520 / $260. There is no separate publication fee any more: it has been $0 since January 1, 2014 (37 CFR 1.18).
How long after paying the issue fee is the patent granted?
Usually a few weeks. Patents issue on Tuesdays, and the Issue Notification with the patent number and issue date is normally available in Patent Center on the Wednesday or Thursday of the week before (MPEP 1306.03 and 1309).
Can I file an IDS after the notice of allowance?
Yes. Before the issue fee is paid, file it under 37 CFR 1.97(d) with a statement under 1.97(e) and the $280 fee. After the issue fee is paid, use the USPTO's Quick Path IDS (QPIDS) program or file an RCE with a petition to withdraw the application from issue.
Should I file a continuation before paying the issue fee?
If you want one, yes. A continuation must be filed while the parent is still pending, and the parent stops being pending when the patent issues. Because patents issue soon after the issue fee is paid, the USPTO recommends filing continuing applications before payment (MPEP 1306.03).
Can I comment on the examiner's reasons for allowance?
Yes. If the examiner states reasons for allowance, you may file a statement commenting on them within the time the examiner specifies (37 CFR 1.104(e)). Comments are often filed where the stated reasons could narrow how the claims are read later.
Sources: 35 U.S.C. 120 and 173 ; 37 CFR 1.17 , 1.18 , 1.27 , 1.97 , 1.104 , 1.311 , 1.312 , 1.313 and 1.705 (eCFR, current to November 2, 2026); USPTO fee schedule (effective January 19, 2025, revised August 14, 2026); MPEP sections 1302, 1303, 1306, 1308 and 1309; USPTO QPIDS page . This guide is general information, not legal advice. Have a registered patent attorney or agent review any filing after allowance.