Skip to content

USPTO guide

USPTO extensions of time: fees, limits and how to ask

By , Co-founder and CEO, PatentAssist.ai
Updated

Most USPTO deadlines in examination can be extended by one to five months simply by paying a fee under 37 CFR 1.136(a). No one has to approve it. A one-month extension costs $235 for a large entity, $94 for a small entity and $47 for a micro entity. The hard limit is 6 months from the Office action: no fee can carry a reply past it. This guide gives the 2026 fees and fee codes, how to request an extension, which deadlines cannot be extended, and what to do if the application has already gone abandoned.

Quick answer

  • Fees (large): $235, $690, $1,590, $2,495 and $3,395 for one to five months. Small entities pay 40%, micro entities 20% (37 CFR 1.17(a)).
  • Limit: 6 months from the Office action (35 U.S.C. 133). After a normal 3-month period, at most 3 months can be bought.
  • How: a petition and the fee, filed before the extended period ends, usually with the reply. Form PTO/AIA/22 is optional.
  • Not extendable: the issue fee, reply briefs, Board decisions and any period the action says cannot be extended.
  • Missed it: the application is abandoned. It can be revived if the delay was unintentional (37 CFR 1.137).

USPTO extension of time fees for 2026

Amounts from 37 CFR 1.17(a) and the USPTO fee schedule in force since January 19, 2025. Fee codes are large / small / micro entity. The last column assumes the usual 3-month shortened statutory period.

USPTO extension of time fees under 37 CFR 1.17(a) in US dollars
Extension Large Small Micro 37 CFR / fee codes Reply due (3-month period)
1 month $235 $94 $47 1.17(a)(1); 1251 / 2251 / 3251 4 months
2 months $690 $276 $138 1.17(a)(2); 1252 / 2252 / 3252 5 months
3 months $1,590 $636 $318 1.17(a)(3); 1253 / 2253 / 3253 6 months
4 months $2,495 $998 $499 1.17(a)(4); 1254 / 2254 / 3254 Not available (past 6 months)
5 months $3,395 $1,358 $679 1.17(a)(5); 1255 / 2255 / 3255 Not available (past 6 months)

The fees are cumulative. If you paid for one month and then need a second, you pay the two-month fee less what you already paid ( MPEP 710.02(e) ). Extensions are bought in whole months; fees are not prorated (MPEP 706.07(f)). Provisional applications have their own, lower extension fees under 37 CFR 1.17(u) and their own form, PTO/AIA/22p. For every other USPTO fee, see USPTO patent fees ; for who qualifies for the reduced rates, see small entity vs micro entity .

How a 1.136(a) extension works

35 U.S.C. 133 gives an applicant 6 months to reply to an Office action, or a shorter time of at least 30 days set by the Director. In practice the action sets a shortened statutory period, usually 3 months, or 2 months for a restriction requirement . 37 CFR 1.136(a)(1) lets you extend that period by up to 5 months or to the statutory maximum, whichever comes first, by filing a petition and the fee. Four rules decide how it plays out:

  • The filing date sets the fee. The date you file the petition and fee decides how many months you need and what they cost; the fee you pay decides when the extended period ends (37 CFR 1.136(a)(2)).
  • Months run from the date of the action. The extended due date is the same day of the month as the Office action date, so an action dated January 31 with a 3-month period is due April 30, and with one month's extension May 31 ( MPEP 710.01(a) ).
  • Weekends do not shift the base date. If a due date falls on a Saturday, Sunday or federal holiday, you may file on the next business day (37 CFR 1.7(a)). But an extension is added to the original calendar date, not to that next business day (MPEP 710.01(a)).
  • The reply must still be filed in time. The petition can be filed before, with or without the reply, but if no reply is on file when the extended period ends, the application is abandoned (37 CFR 1.136(a)(2), 1.135(a)).

Because the 6-month limit counts from the action, the fourth and fifth months are usable only where the period set was shorter than 3 months, or where the period is not tied to a statutory maximum at all. For periods that are not, 1.136(a) allows the full 5 months.

Worked example: a 3-month period

A non-final rejection is mailed on Tuesday, March 10, 2026 with a 3-month shortened statutory period.

  • Reply by June 10: no fee.
  • Reply by July 10: one-month extension, $235 ($94 small, $47 micro).
  • Reply by August 10: two-month extension, $690 ($276 / $138).
  • Reply by September 10: three-month extension, $1,590 ( $636 / $318). This is the 6-month statutory limit.
  • Nothing filed by September 10: the application is abandoned as of September 11 ( MPEP 711.04(a) ).

Extension of time calculator

Enter the mailing date printed on the Office action and the period it sets.

For an Office action with a shortened statutory period. The calculator adds whole months to the action date and stops at 6 months. It does not move dates that fall on weekends or federal holidays, and it does not handle the advisory action rule after a final rejection. Check every date against the application's record in Patent Center.

How to request an extension

The extension takes effect when the petition and fee are filed, without any action by the USPTO ( MPEP 710.02(e) ). You have three ways to make the petition:

  1. The USPTO form. PTO/AIA/22, "Petition for Extension of Time under 37 CFR 1.136(a)", lists the five fee levels for each entity size. The USPTO's forms page lists PTO/SB/22 for applications filed before September 16, 2012.
  2. A sentence in the reply. MPEP 710.02(e) says a proper petition "may be only a few sentences", for example: "The applicant herewith petitions the Director of the United States Patent and Trademark Office to extend the time for reply to the Office action dated ____ for ____ month(s) from ____ to ____."
  3. A constructive petition under 1.136(a)(3). If you forget the petition, the USPTO treats the reply as including one when the file holds a written request to treat future replies that way, or an authorization to charge all required fees, fees under 1.17 or extension fees, or when the 1.17(a) fee is paid with the reply.

The constructive petition is a safety net, not a plan. The USPTO "strongly recommends" an express petition to avoid processing delays. Where a deposit account authorization is on file and you ask for too few months, the USPTO treats the petition as asking for the number of months actually needed (MPEP 710.02(e)). Two more traps from the same section: a reply filed late with a petition but no fee is not timely until the fee arrives, and a petition filed in a continuing application does not extend the time in the parent. If you need the extension only to keep the parent pending while you file a continuation , file the petition in the parent.

When 1.136(a) is not available

Paid extensions are possible "in reply to most Office actions" (MPEP 710.02(e)), but not these:

USPTO periods that cannot be extended under 37 CFR 1.136(a)
Period Rule
Paying the issue fee The 3-month period after a notice of allowance is not extendable (37 CFR 1.311(a)).
Oath or declaration, formal drawings or a biological deposit after a Notice of Allowability Not extendable under 1.136(a) or (b) if set in the Notice of Allowability or a later action (37 CFR 1.136(c)).
Reply brief in an appeal Excluded by 37 CFR 1.136(a)(1)(ii); due 2 months from the examiner's answer (41.41).
Request for an oral hearing before the Board Excluded by 37 CFR 1.136(a)(1)(iii).
Reply to a Board decision, or the time to appeal to court Excluded by 37 CFR 1.136(a)(1)(iv) (decisions under 41.50 or 41.52, and 90.3).
Applications in a contested case or derivation proceeding Excluded by 37 CFR 1.136(a)(1)(v).
Ex parte reexamination Patent owner extensions follow 37 CFR 1.550(c) instead, with the 1.17(g) fee (1.136(d), MPEP 710.02(e)).
Any period the Office action says cannot be extended 37 CFR 1.136(a)(1)(i). MPEP 710.02(e) gives examples: a reply to a notice of allowability and reissue applications involved in litigation.

The appeal brief, by contrast, can be extended: it is due 2 months after the notice of appeal (37 CFR 41.37(a)), and MPEP 710.02(e) uses a late appeal brief as its example of a 1.136(a) extension. See the PTAB ex parte appeal guide for each appeal deadline, and notice of allowance and issue fee for the non-extendable issue fee period.

Extensions for cause under 1.136(b)

Where 1.136(a) is not available, a period can be extended "only for sufficient cause and for a reasonable time specified" ( 37 CFR 1.136(b)). The differences from 1.136(a):

  • The request must be filed on or before the day the reply is due, not afterwards.
  • It must give a reason and pay the 37 CFR 1.17(g) petition fee: $235 ( $94 small, $47 micro), fee codes 1463 / 2463 / 3463.
  • Filing it extends nothing. The Technology Center Director decides, and the extension exists only if granted (MPEP 710.02(e)).
  • It cannot be used when 1.136(a) is available (1.136(a)(2)), and like 1.136(a) it can never pass the statutory maximum.

The USPTO form is PTO/SB/23. Neither 1.136(a) nor (b) can extend the oath, drawings or deposit periods set after a Notice of Allowability (37 CFR 1.136(c)).

Extensions after a final rejection

A final rejection also sets 3 months, but the start date for extension fees can move. If your first reply is filed within 2 months and the examiner mails the advisory action after the 3-month date, the period ends on the advisory action's mailing date and extension fees are calculated from that date ( MPEP 706.07(f), 710.02(e)). Either way, the reply cannot go past 6 months from the final rejection.

Example: a final rejection mailed March 10, 2026, a reply filed May 5 and an advisory action mailed June 25. An RCE filed on July 20 needs only a one-month extension, because it is within a month of June 25. Had the first reply gone in more than 2 months after the final rejection, extension fees would run from June 10 and the same filing would need two months. The final rejection guide covers the choice between an after-final amendment, an RCE and an appeal.

The hidden cost: patent term adjustment

Under 37 CFR 1.704(b) , any time beyond 3 months taken to reply to an Office action counts as applicant delay. Patent term adjustment is reduced by every day from the day after the 3-month date to the day the reply is filed. The rule adds that the period set in the action "has no effect" on that 3-month count. So on top of the fee, a three-month extension can cost up to 3 months of any adjustment the patent would otherwise get. See how long a patent lasts for how the adjustment is calculated.

Missed the deadline: abandonment and revival

If no complete reply is filed by the end of the period, as extended, the application is abandoned ( 37 CFR 1.135(a)). Abandonment happens by operation of law, on the day after the period ended, whether or not a Notice of Abandonment has been mailed (MPEP 711.03(c), 711.04(a)). An after-final amendment that the examiner does not enter does not save the application (1.135(b)).

An abandoned application can be revived by a petition under 37 CFR 1.137(a) if the delay was unintentional. The petition needs:

  • the reply that was due. Where prosecution was closed, for example by a final rejection, an RCE can serve, and a continuing application can serve where a nonprovisional application was abandoned for failure to prosecute (1.137(c));
  • the petition fee under 37 CFR 1.17(m);
  • a statement that the entire delay, from the due date to the filing of a grantable petition, was unintentional; and
  • a terminal disclaimer, but only for design applications and for utility or plant applications filed before June 8, 1995 (1.137(d)).
USPTO petition fees to revive an abandoned application
Fee Large Small Micro 37 CFR / fee codes
Petition to revive, filed one year or less after abandonment $2,260 $904 $452 1.17(m)(2); 1453 / 2453 / 3453
Petition to revive, filed more than one year after abandonment $3,000 $1,200 $600 1.17(m)(1); 1468 / 2468 / 3468

The USPTO form is PTO/SB/64. Move fast: the USPTO generally does not question the delay when the petition is filed within 3 months of first learning of the abandonment and within 1 year of the abandonment date ( MPEP 711.03(c) ). For petitions filed after August 13, 2026, it requires an additional explanation of the circumstances of the delay when the petition comes more than one year after abandonment, down from two years before ( 91 FR 37827 ). The same petition revives an application abandoned for an unpaid issue fee, and a similar petition under 37 CFR 1.378 reinstates a patent that expired for an unpaid maintenance fee .

Spend the extra months on the reply

PatentAssist.ai searches USPTO, EPO and Indian records, so you can check the examiner's references and look for better art before you answer, and it drafts claim sets for new filings such as a continuation. It does not file papers, pay fees or track deadlines with the USPTO; that stays with you or your practitioner. Our guide to the USPTO office action response covers the reply itself.

More USPTO guides

All guides, by patent office

USPTO extensions of time: frequently asked questions

How much is a USPTO extension of time in 2026?

Under 37 CFR 1.17(a), a large entity pays $235 for one month, $690 for two, $1,590 for three, $2,495 for four and $3,395 for five. Small entities pay 40% of those amounts ($94 for one month) and micro entities 20% ($47). These amounts have applied since January 19, 2025.

How much is a one-month extension for a small entity?

$94, fee code 2251. A micro entity pays $47 (code 3251) and a large entity $235 (code 1251).

What is the USPTO form for an extension of time?

PTO/AIA/22, "Petition for Extension of Time under 37 CFR 1.136(a)", for nonprovisional applications. PTO/SB/22 is the version on the USPTO's page of forms for applications filed before September 16, 2012, and PTO/SB/23 is for a request for cause under 1.136(b). The form is optional: a short written petition in the reply works, and an authorization to charge extension fees is treated as a petition under 1.136(a)(3).

Can I extend the time to respond to an office action beyond 6 months?

No. 35 U.S.C. 133 sets a 6-month maximum from the Office action, and no extension under 37 CFR 1.136(a) or (b) can go past it. With the usual 3-month period, three months of extension is the most you can buy. If you miss the 6 months, the application is abandoned and can only be revived by petition.

What does 37 CFR 1.136(a)(3) mean?

It is a safety net. If you forget to include a petition for extension, the USPTO treats the reply as including one when the file holds a written request to treat future replies that way, or an authorization to charge all required fees, fees under 1.17 or extension fees, or when you pay the 1.17(a) fee with the reply. The USPTO still recommends filing an express petition.

What is the difference between 37 CFR 1.136(a) and 1.136(b)?

1.136(a) is automatic: file the petition and fee before the extended period ends and the extension takes effect without any decision. 1.136(b) is only for periods where 1.136(a) is not available. It needs a reason, must be filed on or before the due date, costs $235 under 1.17(g), and extends nothing until the USPTO grants it.

Does an extension of time reduce patent term adjustment?

Yes. Under 37 CFR 1.704(b), every day after 3 months from the Office action until you reply is subtracted from patent term adjustment. The period set in the action does not matter, so a paid extension still costs term day for day.

How do I revive an abandoned patent application?

File a petition under 37 CFR 1.137(a) with the missing reply, the 1.17(m) petition fee and a statement that the entire delay was unintentional. The fee is $2,260 ($904 small, $452 micro) within one year of abandonment and $3,000 after that. Form PTO/SB/64 can be used. Design applications, and utility or plant applications filed before June 8, 1995, also need a terminal disclaimer.

Sources: 35 U.S.C. 133 ; 37 CFR 1.7 , 1.17 , 1.135 , 1.136 , 1.137 , 1.311 , 1.704 , 41.37 and 41.41 (eCFR, current to October 29, 2026); USPTO fee schedule (effective January 19, 2025, revised November 1, 2026); MPEP sections 706.07(f), 710.01(a), 710.02(e), 711.03(c) and 711.04(a); USPTO patent forms . This guide is general information, not legal advice. If a deadline has passed or the action says the period cannot be extended, ask a registered patent attorney or agent.